- A good quote names the panel model and the inverter model, not just the brands.
- It states the system size in kW, the number of panels and where they go.
- It lists switchboard work, network approval and your compliance certificate.
- It shows the full price with the certificate discount taken off, and every warranty in years.
The equipment, by model
“Tier 1 panels” is not a specification. The quote should name the panel make and model and its wattage, and the inverter make, model and size. You should be able to look both up.
If a battery is planned, now or later, the quote should say whether the inverter is hybrid-ready or what changes if you add one.
Size and layout
System size in kW, the number of panels, and a layout showing which roof faces they go on. North makes the most across the year; east and west suit homes that use power in the morning or evening. A good quote explains the choice rather than filling every face.
The work around the panels
- Switchboard work: isolators, safety switches and any upgrade the board needs.
- Network approval: the application to your electricity distributor, done before install.
- Your certificate of compliance for electrical work, issued when the job is finished.
- Who does the install. Ask whether it is the company’s own team or a subcontractor.
The price and the warranties
The full price, with the solar certificate discount already taken off, so there is no surprise later. Warranties listed in years: panel product, panel performance, inverter, and the installer’s workmanship warranty, which is separate from the manufacturers’.